ISO
ISO 9001-Certified
Every clash report, coordination record, and model file goes through a formal review and approval process before it is issued to your team.

Design conflicts discovered during construction lead to costly rework, project delays, and coordination issues. Monarch Innovation delivers BIM clash detection across architectural, structural, and MEP models to identify hard, soft, and workflow clashes before construction begins. We help project teams resolve conflicts early, reduce risks, and build with confidence.
17+
Years of BIM Experience
100+
Projects Coordinated
20+
Industries Served
99%
On-Time Delivery
SERVICE OVERVIEW
BIM clash detection is the process of running automated checks across multiple 3D discipline models to find locations where objects from different systems physically intersect, come too close, or violate clearance rules.
A clash can be a structural beam running through a duct, a pipe colliding with a conduit, or a maintenance access route blocked by equipment. Automated clash detection finds every one of these conflicts systematically and documents them for resolution before construction begins.
Types of BIM Clashes We Detect and Resolve
Hard Clashes
Hard clashes occur when two building elements physically occupy the same space within the model. Examples include a pipe passing through a concrete wall, a duct intersecting a structural beam, or overlapping cable trays.
Soft Clashes
Soft clashes occur when building components do not physically intersect but fail to maintain the required clearance for installation, insulation, maintenance, or future access. For example, an insulated pipe may leave insufficient space for flange installation or servicing.
Workflow Clashes
Workflow clashes arise when construction activities compete for the same workspace or interfere with planned construction sequencing. For example, structural steel installation may block access for MEP installation teams.
Discipline Coordination
We federate architectural, structural, mechanical, electrical, and plumbing models into a single coordinated BIM environment, allowing comprehensive clash detection and issue resolution across all disciplines.
Every clash found in the model costs a fraction of what the same clash costs to resolve in the field. Monarch Innovation eliminates these problems before construction starts.

OUR SERVICES
Monarch Innovation delivers end-to-end clash detection and BIM coordination across every project phase, from design development through construction support.
01
We combine models from every discipline into a single federated BIM environment using Navisworks or BIM 360. All models are checked for georeferencing, datum alignment, and file integrity before any analysis begins.
Best for: Multi-discipline projects with models from different design teams.
02
We configure and run automated clash tests using rule sets built for your project. Every test is documented with clash count, severity, discipline pair, and location reference.
Best for: Projects with large model volumes where manual checking is not practical.
03
Every detected clash is classified by type, severity, and urgency. We remove duplicates, group related clashes, and produce a prioritized list so your team focuses on what matters most first.
Best for: Projects with hundreds or thousands of clash results to manage efficiently.
04
We chair and facilitate coordination meetings, work directly with discipline designers to resolve clashes, track issue status, and verify that accepted solutions are correctly modeled.
Best for: EPC and design-build projects where multi-team coordination is complex.
05
Beyond physical interference, we check every system against access and maintenance envelope requirements. Equipment that physically fits but cannot be maintained is flagged before the design is finalized.
Best for: Process plants, data centers, and facilities with complex maintenance requirements.
06
We use 4D BIM simulation to check whether construction activities in your program conflict with each other. Craning corridors, temporary works, and installation sequences are validated against the model.
Best for: Complex projects with tight programs and constrained site logistics.
07
We produce clear, contractor-ready clash reports with screenshots, model coordinates, and resolution instructions. Reports are issued in BCF format for direct integration with your design software.
Best for: All project types. BCF format works with Revit, ArchiCAD, and all major BIM platforms.
08
After designers resolve clashes, we re-run detection to confirm every issue is closed and no new conflicts have been introduced. A final coordination certificate is issued before construction starts.
Best for: Projects requiring audit-ready documentation for owner or regulator review.
Does Your Project Model Need a Coordination Check Before Construction Starts?
Get a Free First Clash RunWHY MONARCH INNOVATION
There are many firms that offer BIM coordination services. Here is what makes Monarch Innovation consistently the right choice for demanding engineering and construction projects.
ISO
Every clash report, coordination record, and model file goes through a formal review and approval process before it is issued to your team.
3D
Every project starts in a federated 3D environment. We do not use 2D overlay methods. This means more precise clash detection and more reliable resolution.
BCF
All clash reports are issued in BIM Collaboration Format. Your designers can import issues directly into Revit or ArchiCAD and track resolution without extra tools.
Our involvement continues through construction. We respond to RFIs, issue model updates, and produce as-built coordination records for your operations team.
FULL
We configure clash detection rules based on applicable codes, client specifications, and project requirements, including clearance, accessibility, operability, and fire protection standards where required.
MULTI
Our BIM coordinators work directly with structural, MEP, civil, and process engineers. One team handles all discipline interfaces with no external handoffs.
OWNER
All coordinated models, clash reports, and project data created in your engagement belong to you. Monarch Innovation makes no claim on your deliverables.
ENGAGEMENT PROCESS
Our coordination process is structured to deliver reliable results quickly, with full transparency at every stage.
You Submit Your Models and Project Data
We Review and Issue a Scope and Quote
We Federate the Models and Configure Clash Rules
We Run Automated Clash Detection and Classify Results
We Facilitate Coordination Meetings and Track Resolutions
We Verify and Coordination Certificate
Send your discipline models, project BEP, coordination matrix, and applicable clearance standards. We accept Revit, IFC, NWC, and all major BIM formats.
We review model quality, discipline coverage, and coordination requirements before providing a detailed scope, deliverables, project timeline, and fixed-price quotation.
We federate all discipline models in Navisworks or Autodesk Forma, configure project-specific clash rules, and validate coordination settings before analysis begins.
Automated clash runs are executed across all discipline pairs. Every detected clash is reviewed, duplicate issues are consolidated, and conflicts are categorized by type, severity, and responsible discipline.
We issue the clash report, facilitate coordination meetings, assign resolution actions to discipline owners, and track every issue through to close.
After all clashes are resolved, we run a final verification pass and issue a coordination report confirming the federated model is construction-ready.
You Submit Your Models and Project Data
Send your discipline models, project BEP, coordination matrix, and applicable clearance standards. We accept Revit, IFC, NWC, and all major BIM formats.
We Review and Issue a Scope and Quote
We review model quality, discipline coverage, and coordination requirements before providing a detailed scope, deliverables, project timeline, and fixed-price quotation.
We Federate the Models and Configure Clash Rules
We federate all discipline models in Navisworks or Autodesk Forma, configure project-specific clash rules, and validate coordination settings before analysis begins.
We Run Automated Clash Detection and Classify Results
Automated clash runs are executed across all discipline pairs. Every detected clash is reviewed, duplicate issues are consolidated, and conflicts are categorized by type, severity, and responsible discipline.
We Facilitate Coordination Meetings and Track Resolutions
We issue the clash report, facilitate coordination meetings, assign resolution actions to discipline owners, and track every issue through to close.
We Verify and Coordination Certificate
After all clashes are resolved, we run a final verification pass and issue a coordination report confirming the federated model is construction-ready.
BUSINESS BENEFITS
Investing in professional clash detection and BIM coordination has a measurable impact on your project cost, schedule, and risk profile.
Business Benefit
What It Means for Your Project
Reduce Rework and Construction Costs
Identifying and resolving design conflicts during coordination is significantly more cost-effective than addressing them during construction. Early clash detection helps reduce rework, improve productivity, and control project costs.
Keep Projects on Schedule
Site stoppages caused by design clashes are among the most common reasons construction projects fall behind schedule. Resolving conflicts early reduces site disruptions and keeps projects on schedule.
Minimize RFIs During Construction
Resolving coordination issues before construction reduces the number of Requests for Information (RFIs), minimizes administrative effort, and supports faster decision-making throughout the project lifecycle.
Optimize Capital Costs Through Better Coordination
Coordination often reveals routing inefficiencies and layout improvements that reduce material quantities and civil work. Projects that invest in early coordination typically see measurable CAPEX savings.
Improve Facility Handover and Asset Management
A fully coordinated model with verified clearances becomes a reliable asset management reference for your operations team. Maintenance planning, space management, and future modifications all benefit.
Streamline Multi-Discipline Collaboration
When one experienced team manages the federated model, runs clash detection, and chairs coordination meetings, you deal with one point of accountability instead of managing conflicts between multiple discipline teams.
Ready to Eliminate Design Conflicts Before Construction Begins?
Schedule a Technical Call→TECHNOLOGIES AND TOOLS
We support all major BIM coordination environments. If your project has a specific platform requirement, we can match it without any additional setup time.
Navisworks Manage and Simulate
Autodesk BIM 360 Coordinate
Solibri Model Checker
Tekla BIMsight
Autodesk Revit (Architecture, Structure, MEP)
IFC open format
Tekla Structures
MagiCAD
AutoCAD MEP
Autodesk Forma
Autodesk BIM 360
Trimble Connect
ProjectWise
BCF Manager
BIM Track
Revizto
custom Excel-based tracker
PDF clash reports with model screenshots
OUR ENGINEERING EDGE
Our BIM coordination team has delivered clash detection and model coordination across a wide range of sectors. Here are the industries where we have the deepest experience.
We coordinate architectural, structural, and MEP models for office towers, hotels, retail developments, and mixed-use projects where design complexity and program pressure demand rigorous model coordination.
We run clash detection for onshore processing plants, LNG terminals, refineries, and offshore topsides, applying process piping, structural steel, and equipment clearance rules throughout.
We coordinate models for hospitals, research facilities, and pharmaceutical manufacturing plants where above-ceiling coordination and cleanroom integrity are critical to project success.
We coordinate the dense MEP systems in data centers and critical infrastructure facilities where spatial constraints are extreme and construction tolerance is minimal.
We handle clash detection for heavy manufacturing facilities including crane coverage verification, conveyor routing, and process equipment clearance checking.
We provide BIM coordination for tunnels, bridges, rail stations, and utility corridors where underground services, structural elements, and construction sequence all need careful 3D management.
We coordinate models for combined cycle plants, renewable energy facilities, and transmission substations, applying electrical clearance and maintenance access requirements throughout.
We coordinate complex education, civic, and cultural building projects where architectural ambition and technical systems need precise spatial management.
FAQ SECTION
Monarch Innovation gives you experienced BIM coordinators, proven clash detection workflows, and clear documentation from your first model submission to your final coordination certificate